Regency U39-NG1 Manuale Utente

Pagina di 44
Regency
®
 U39 ULTIMATE Direct Vent Freestanding Gas Stove
15
INSTALLATION
DV STOVE HORIZONTAL VENT KIT INSTALLATION
Minimum Installation Height:
U39: 59-3/4" ( 1518mm)
DV STOVE HORIZONTAL VENT KIT (# 946-116 & #946-216)
DV Stove Horizontal Vent Kit (2 ft. Part # 946-116 or 4 ft. Part # 946-216) includes all the parts needed to install the U39 with  minimum horizontal 
and vertical vent dimensions. For installations that require longer vertical and/or horizontal vents 
see the "Dura-vent Termiantion Kit and Component" sections. 
    Qty.  Description
1)
 1 
Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
 
 Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter 
2) 1 
Flex Liner, compressed aluminium 2 ply liner, 
 
 4" (102mm) inside diameter
3) 4 
spring spacers
4) 1 
90 deg. Elbow
5) 1 
Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pieces
6) 1 
Thimble Cover
7)  1 Wall Thimble (2 pcs.)
8) 1 
Adapter 
9) 1 
AstroCap Termination Cap
10) 2 Trim Collar
11) 1 tube of Mill-Pac, high temperature sealant
12) 12 Screws, #8 x 1/2" Self tapping, Stainless Steel
13) 13 Screws, #8 x 1/2" Self tapping, Black
14) 4 Screws #8 x 1-1/2" Drill Point, Black
15) 4 Screws #8 x 1-1/2" Drill Point, Stainless Steel
16) 8 Wood screws #8 x 1"
Optional:
946-206  Vinyl Siding Standoff for AstroCap
Note: 
Review the following sequence of 
instructions which are typical of most 
installations. The sequence may vary 
depending on wall thickness. Refer to  vent 
location and clearance dimensions in 
"Exterior Vent Termination Locations" 
to "DV Stove Horizontal Vent Kit" 
sections.
1)  Set the unit in its desired location. 
Check to determine if wall studs will 
be in the way of the venting system, 
adjust location until all clearances are 
met and there are no obstructions.
Note: A 1-1/2"(38mm) clearance 
around the outer pipe must be 
maintained except that only a 
1" (25mm) clearance is needed 
at the termination end. 
IMPORTANT:
Do not locate termination hood 
where excessive snow or ice buildup 
may occur. Be sure to check vent 
termination area after snow falls, 
and clear to prevent accidental blockage of 
venting system. When using snow blowers, 
make sure snow is not directed towards vent 
termination area.
2) Assemble 
trial fi t to determine the vertical 
center-line for the vent termination.
 
a)  Cut a 9-1/2" x 9-1/2" (241mm x 241 
mm) square hole on both the interior 
and exterior wall.
 
b)  Install wall thimbles on both interior 
and exterior wall with 4 wood screws 
(#8 x 1") per thimble.
 
c)  Attach the 2 piece adjustable pipe 
section to the vent terminal and 
slide into position from the exterior. 
The larger diameter end of the 
adjustable pipe goes to the vent 
terminal.
 
d)  Install the 90
o
 elbow onto the 
adjustable pipe to determine the 
vertical centerline of the starter collar 
on the unit. 
a)  Liner sections should be continuous without any joints or 
seams.
b)  This is an approved system, therefore components in this 
system must not be substituted for any other manufacturer's 
products.