Koblenz ai-1260-p Guida Utente

Pagina di 12
3/12 
November
 / 2006
 
 
 
 
 
   
I.- FINAL TEST FOR PRODUCT SAFETY  
 
A the completion of any repair the product should be electrically tested for running and electric strength as follows 
1.- ELECTRIC TEST 
1).- Set hip-pot test meter at 1500 volts. 
2).- Product switch to ON-position. 
3).- Touch one probe of tester to one blade of power cord plug and touch other probe to handle tube, there should be no 
breakdown. 
2.- OPERATING TEST 
Run the machine and check the suction at hose intake. 
1).- There should be no abnormal noise or vibration 
2).- With the intake open the current shall be no more than 9.0 A. 
3).- With the intake closed the current shall drop to aprox. 5.5 A.
 
 
II.-REPLACEMENT PROCEDURES 
 
 
 
1.- TO REPLACE THE MOTOR (71) 
1.1.- Remove the head assembly from the machine. 
1.2.- Remove de six screws (61) around the head. 
1.3.- Lift the  cover  (65) ,  and disconnects the motor and ground lead (87). 
1.4.- Remove the noise reductor (88), the motor cover (68) the motor gasket (70) and the noise reductor (89). 
1.5.- Replace the motor (71) making sure the motor gasket, to motor protector is placed into the motor base (72). 
1.6.- Reconnect and reassemble. 
NOTE: Do not attempt to the repair motor send for service. 
2.- TO REPLACE THE ONE CORD (83) 
2.1.- Follow steps 1.1 and 1.2 
2.2.- Lift cover as far as wiring permits. 
2.3.- Remove the line cord strain relief (84) using HEYCO pliers and separate the line cord (83). 
2.4.- Replace the line cord at the same distance from the end as before 
2.5.- Using the Heyco pliers reinserts the strain relief on the head cover 
2.6.- Reconnect and reassemble 
3.- TO REPLACE THE ON-OFF SWITCH (67) 
3.1- Follow steps 2.1 and 2.2 
3.2.- Press the side tabs on the switch and pull it out of the head cover 
3.3.- Replace the new switch pressing it on opening until the tabs snap and reconnect the leads. 
4.- TO REPLACE THE PLASTlC COVER (55) 
4.1.- Remove the head assembly from the machine. 
4.2.- Remove the four screws (54) and lift the plastic cover handle (53) and the noise reductor (56). 
4.3.- Replace the plastic cover making sure put the noise reductor and the handle. 
5.- TO REPLACE THE COVER HANDLE (53) 
5.1.- Follow steps 4.1 and 4.2. 
5.2.- Replace the cover handle. 
6.- TO REPLACE THE COOLlNG VENTS (60) 
6.1.- Remove the two screws (59) on the cooling vents and remove it 
6.2.- Replace the new vents and screws. 
7.- TO REPLACE VENT SEAL (81) 
7.1.- Follow steps 4.1 and 4.2 
7.2.- Remove the seal from motor cover (65). 
7.3.- Place the new seal. 
8.- TO RE PLACE SPONGE FILTER (90) 
8.1.- Remove  the head. 
8.2.- Remove the filter (2) from cage (78). 
8.3.- Remove the sponge filter (90).