Zhone 6350 Manuale Utente

Pagina di 24
7
5. Insert the supplied power cord’s round end into the jack labeled POWER. Plug the 
transformer into an AC outlet.
The ReachDSL modem hardware installation is now complete. When the power cord is 
installed, the ReachDSL modem goes through a power-on self-test.
Power-On 
When power is applied, the ReachDSL modem performs self-diagnostics and the PWR 
LED is on. The self-diagnostics includes a power-on self-test and all of the LEDs turn on 
for one second. 
PHONE  LINE
ETHERNET
POWER
01-17010
Power
Jack
Transformer
or
ReachDSL
TST
LINE
ETHERNET
ALM
PWR
TX/RX
01-17003
Power – green
Alarm – red
Test – yellow
Transmit/Receive – green
Ethernet Link – green
DSL Line – green