Thetford 9162 Manuale Utente

Pagina di 16
Table of Contents
Electrical and LP Gas Requirements
This refrigerator is designed to operate with the following energy sources:
LP Gas Operation 11 inches Water Column Propane
12 volts DC control voltage (15.4 volts max. - 10.5 volts min.)
AC Operation
120 volts AC (132 volts max. - 108 volts min)
12 volts DC control voltage (15.4 volts max. - 10.5 volts min.)
DC Operation 
12 volts DC (15.4 volts max. - 11.5 volts min.)
Operating where these specifications are exceeded can damage the refrigerator’s electrical circuit and its related components
and will void the refrigerator’s warranty.
Requirements
Electrical and LP Gas.............................
2
Safety Awareness .................................
3
Introduction............................................
4
About Your Refrigerator
Storage Volume......................................
5
Leveling ..................................................
5
Freezer Compartment ............................
5
Fresh Food Compartment ......................
5
Defrosting and Cleaning
.........................
5
Crispers.............................
.....................
5
Moisture Reduction Heater
.........
..
..........
5
Interior Light............................................
6
Door Handle ...........................................
6
Door Bins and Bin Slide .........................
7
Checking Door Seal ...............................
7
Door Alarm .............................................
8
Adjustable Shelves.................................
8
Operating Controls
Operating Instructions ............................
8
Auto Mod
e
...................................
.
..........
.9
Manual Mode..........................................
9
Backup Operating System......................
9
Diagnostics
Diagn
osic Codes..................................10
Diagnostic Codes and 
Their Meanings
...............................10
Refrigerator Failure .............................. 1
1
Maintenance
Maintenance Requirements ................. 1
1
Refrigerator Storage ............................. 1
2
Refrigerator Removal/Replacement ..... 1
2
Burner Flame Inspection ...................... 1
2
Cleaning the Cooling System Flue ....... 1
2
Burner Orifice Removal & Cleaning ..... 1
3
Fuse Replacement ............................... 1
4
Wiring Pictorials...................................15
Warranty..............................................16
Requ
iremen
ts
2