Haier ad212bmbaa Manuale Utente

Pagina di 31
Installation procedure
Other instruction and test run
29
Other instruction
    1.Power supply
  The air conditioner must use a special power circuit and special air switch.
        The users should provide special switch, grounding wire by themselves.
        The wiring should be done by a qualified electrician according to the wir-
        ing rules specified by national standard
        An creepage breaker should be installed.
        The grounding wire and null wire of receptacle should be strictly separated.
        It is incorrect to connect the null wire with grounding wire.
         
The connection method of power cord is Y connection. If the power cable
         is damaged,in order to avoid danger, it must be replaced by the manufacturer
        or its specified repair center of the same qualified worker.
2. Cut and flaring method
     Use pipe cutter to cut the pipe, the burrs must be removed.
    
  After inserting the flarer, perform flared nut.
Flarer
Incorr
Slant
Broken
Uncompleted
Burrs
Too long
A
Pipe diameter
Liquid pipe
Dimension A (mm)
9.52mm (3/8î)
1.0-1.2
Connect pipe
Gas pipe
1.4-2.2
19.05mm (3/4î)
Flaring dimensions as follows:
Correct
Test run
It is necessary the installer perform the test run for one time to check if the
unit works normally.
Note: The wiring diagram of this model is pasted inside of the unit.
After installing the refrigerant pipe, drain hose and electric wire properly,
perform test run to ensure the system not have trouble.