Installation Procedure
Vacuum pumping
With a vacuum pump, create vacuum from the stop valve of the outdoor unit.
   Emptying with refrigerant sealed in the outdoor unit is absolutely forbidden.
Open all valves
Open all the valves on the outdoor unit.
Gas leakage detection
Check with a leakage detector or soap water that if there is gas leakage at the pipe
connections and bonnets.
Insulation treatment
Conduct insulation treatment on both the gas side and liquid side of pipes respectively.
During cooling operation, both the liquid and gas sides are cold and thus shall be insulated
so as to avoid dew generation.
The notch upward (Attached detail view)
Indoor unit
Subsidiary insulation tube
Field piping side
2
When the unit have the Return air box (see the following picture) when shipping
from the factory and they are of back-side return air type.
R22:Series 07
R22:Series 24
R22:Series 09-21
R407C:Series 07-24
Cautions
NOTE
 The insulating material at gas side shall be resistant to a temperature above 120*.
 The indoor unit pipe connection part shall be insulated.
The connection of indoor unit pipes must use double spanners.
The installing torque shall be as given in the following table.
Double-spanner
operation
Connecting pipe
O.D.(mm)
ÿ6.35
ÿ9.52
ÿ12.70
ÿ15.88
Installing torque
(N-m)
11.8 (1.2kgf-m)
24.5 (2.5kgf-m)
49.0 (5.0 kgf-m)
78.4 (8.0 kgf-m)
Increased installing
torque (N-m)
13.7 (1.4 kgf-m)
29.4 (3.0 kgf-m)
53.9 (5.5 kgf-m)
98.0 (10.0 kgf-m)
Pipe expansion dimensions as follows:
Slope  Damage  Bur  Partial  Overlong
Correct
Incorrect
6.35 mm (1/4
"
)      0.8 ~ 1.5
9.52 mm (3/8
"
)      1.0 ~ 1.8
12.7 mm (1/2
"
)      1.2 ~ 2.0
15.88 mm (5/8
"
)    1.4 ~2.2
Pipe diameter 
ÿ
Size A (mm)