Citel 6000 Guida Utente
PBXgateway
™
& EXTender
TM
6000 System Administrator’s Guide
41
Before you Power-Up the PBXgateway and EXTender 6000
Introduction
This procedure will detail the necessary steps to perform BEFORE bringing the
units online.
units online.
Checklist
Power Up
Power-Up
Sequence
Power Up
Power-Up
Sequence
The units are secured to a rack or placed on a shelf within the rack.
The appropriate 50-pin female, RJ-21 connectors are connected to the
Telephony Interface and wired to the PBX (PBXgateway) and remote user
phones (Remote unit).
At least one WAN port is connected to the appropriate network-terminating
device.
or
The LAN port is connected to your network using a standard RJ-45 Ethernet
cable.
If the above checklist is OK, plug the power cord into an AC outlet.
The WAN (PWR, 1, 2) and the Port Status LEDs (1-8 or 1-12) will begin to
flash. The unit automatically runs through a series of self-tests. After the tests
are complete, all active WAN port LEDS and connected phone ports should be
lit solid “Green”.
Note: If the LEDs do not light as described above, see the Troubleshooting
chapter.
The appropriate 50-pin female, RJ-21 connectors are connected to the
Telephony Interface and wired to the PBX (PBXgateway) and remote user
phones (Remote unit).
At least one WAN port is connected to the appropriate network-terminating
device.
or
The LAN port is connected to your network using a standard RJ-45 Ethernet
cable.
If the above checklist is OK, plug the power cord into an AC outlet.
The WAN (PWR, 1, 2) and the Port Status LEDs (1-8 or 1-12) will begin to
flash. The unit automatically runs through a series of self-tests. After the tests
are complete, all active WAN port LEDS and connected phone ports should be
lit solid “Green”.
Note: If the LEDs do not light as described above, see the Troubleshooting
chapter.