3com 4005 Istruzione Sull'Installazione

Pagina di 77
Location Requirements
17
The following list shows the amount of rack space that is needed to install a 
Switch 4005 chassis in a Telco rack or a Metric rack:
Height — 23 cm / 9 in. 
The height of the chassis, allowing for some extension beyond the location 
of the upper and lower unit dividing lines.
Telco Rack Unit — 5 RU
The unit of measure is 1 Rack Unit (1.75 in. or 4.45 cm). 
Metric Rack Unit — 10 SU
The unit of measure is 1 System Unit (25 millimeters).
Front clearance — 8 cm / 3 in.
This is the recommended minimum space required between the front of the 
chassis and another vertical surface (such as a rack door). Your cabling may 
require that you leave the rack door open.
Precautionary
Guidelines
Safety regulations stipulate that the table, shelf, or rack on which the Switch 
4005 rests can support at least 61.8 kg (136.5 lb), which is three times the 
weight of a fully loaded Switch 4005 chassis.
To reduce the possibility of personal injury or serious damage to the chassis, use 
at least two people to install the chassis. This is especially important for rack 
installations, because you must hold the chassis in place while you secure it to 
the rack.
If you are installing the Switch 4005 in a rack, first ensure that the rack is 
installed properly according to the manufacturer’s instructions, which may 
include steps such as:
Ground the rack in accordance with the rack manufacturer’s instructions. 
Bolt the rack to the floor.
Make certain that the rack is properly aligned and squared. Use a framing 
tool to ensure that the rack is squared.
Use the following guidelines to tighten screws to Torque Specification:
Module faceplate screws — 1.3 in/lb (inch-pounds)
Power supplies and fan trays to the chassis — 1.3 in/lb 
#10 screws for holding the chassis onto a rack — 22-25 in/lb 
To ensure that you tighten screws to Torque Specification, use a torque 
screwdriver.