Pre-construction brackets are position-able and designed to span up 
to 24" centers.  The mounting hole cut-out can be placed at any point 
between studs, joists or trusses. 
 
If you use pre-construction brackets, the installation of your speakers 
will be easier and much faster because the drywall installers will do 
the cutting for you. 
 
There are several Pre-construction bracket models: 
 
RIR-5, 6, & 8 for the round speakers (figure 6) 
RIB-5, 7 & 8 for the rectangular speakers (figure 7) 
 
2.     Fasten the pre-construction brackets in their respective locations.  
After fastening the mounting straps to the studs or trusses, slide the 
mounting hole cut-out portion of the bracket into the desired 
position. 
 
3.     Choose a location in the wall close to the stereo equipment center 
(ideally within 6') to mount a multi-gang “J-box” (figures 1a & 5) 
for the head-out.  Preferably, this location will be easily accessible 
and will not be visible once the equipment is in place. 
 
4.     What Size “J-boxes”? 
 
Each “gang” when IWM-8BPG jack plates are used (figure 4a) will 
accommodate two pairs of speakers. So a 3 gang J-box will provide 
termination for six rooms or six pairs of speakers at the head-out 
point (figure 4b)
 
Following the example of six rooms, obtain: 
 
One 3 gang J-box for the head-out termination new construction 
nail-on type 
(figure 1a) 
Six 22.5 cubic inch 3 5/8" deep single gang J-boxes for the 
volume controls new construction nail-on type (figure 2a) 
 
5.     Fasten the head-out J-box. 
 
6.     Fasten the volume control J-boxes in their respective locations, 
usually at light switch height. 
 
Now you are ready to run the wire. 
 