Juniper CBL-PWR-10AC-STR-UK Manuale Utente

Pagina di 232
To install a DC power cable (see
):
1.
Verify that there is no power flowing from either external power source, so that the
voltage across the leads of the power cables is 0 V. Ensure that there is no chance
that the cable leads might become active during the procedure.
2.
Verify that a licensed electrician has attached a listed power cable lug to each power
source cable.
3.
Loop the power cables through the hook located on the faceplate to the right of the
field-wiring terminals.
4.
Depending on the type of power cable lugs used, loosen or remove the screws on the
field-wiring terminals.
5.
Insert the power cable lugs into the appropriate field-wiring terminals. Using a number
1 Phillips screwdriver, turn the screw on each field-wiring terminal clockwise to secure
the power cable lug. Apply between 8 lb-in. (.9 Nm) and 9 lb-in. (1.02 Nm) of torque
to each screw.
a.
Insert the positive (+) source cable into the return terminal, which is labeled
RTN
.
b.
Insert the negative (–) source cable into the input terminal, which is labeled
–48V
.
6.
Verify that the DC source power cabling is correct, that the DC power cables are not
touching or blocking access to router components, and that they do not drape where
people could trip on them.
Figure 56: Connecting DC Power Cables
Related
Documentation
121
Copyright © 2012, Juniper Networks, Inc.
Chapter 15: Replacing M7i Hardware Components