Cisco Cisco Aironet 1810 OfficeExtend Access Point Guida All'Installazione

Pagina di 40
8
 
4  
Unpacking the AP
To unpack the access point, follow these steps:
Step 1
Unpack and remove the access point and the mounting accessories, from the shipping box.
Step 2
Return any packing material to the shipping container and save it for future use.
Step 3
Verify that you have received the items listed below. If any item is missing or damaged, contact 
your Cisco representative or reseller for instructions.
The access point.
AIR-OEAP1810-CRD cradle kit, to place access point on a desk.
AIR-PWR-D Cisco local power supply
The following accessories can be ordered separately:
Spare cradle kit AIR-OEAP1810-CRD=, includes back cover and RJ-45 jumper cable.
Spare Cisco local power supply AIR-PWR-D=.
Physical security kit AIR-SEC-50=, which includes 50 security screws used to secure the access 
point onto wall-mounting bracket, 50 RJ-45 block-out plugs and 2 unlock keys for blocking 
physical access to the RJ45 Ethernet ports.