Cisco Cisco ONS 15216 DWDM System Guida All'Installazione

Pagina di 26
4
Unpacking and Installing the Cisco ONS 15216 Five-Component Bay Assembly (15216-TERM-BAY)
78-15972-01
  Recommended Material
Recommended Material
Because most of the installation is complete when you receive the system, the bay assembly requires 
little installation material. The most significant tasks are removing the packaging from the bay assembly 
and removing the bay assembly from the shipping pallet. Because the actual installation of the bay 
assembly in each facility is done according to local site practice, your material needs may vary. 
Cisco recommends that you have the following items on hand for installation:
A forklift or pallet jack to move the packaged bay assembly to the unpacking/staging area
A pair of scissors to cut the plastic banding on the shipping container
Utility blankets or their equivalent to protect the bay assembly while on the forklift or pallet jack
Phillips screw driver or cordless drill with Phillips bit
3/4 inch socket or box-end wrench for the earthquake floor bolts
Four optional kits listed in 
 that can be ordered separately
Use this guide in conjunction with the latest release of Cisco ONS 15216 documentation.
Unpacking Instructions
The ONS 15216 five-component bay assembly ships in a corrugated container that covers the unit on its 
shipping pallet. After removing the corrugated container, you must remove the bolts that hold the rack 
to the pallet before moving the unit to the desired location. 
 shows the five-component 
bay assembly on a shipping pallet.
Caution
Cisco recommends that a minimum of three people move the bay assembly.
Step 1
Use a forklift or pallet jack to place the shipping container as close to the installation location as 
possible.
Step 2
Cut the plastic banding off of the cardboard shipping container. 
Step 3
Remove the cap from the corrugated container. 
Step 4
Pull the side panels away from the shipping pallet and set it aside.
Step 5
Remove the base plate from the bottom front of the rack:
a.
Remove the two screws that fasten the kick plate to the rack. 
b.
Pull the base plate away.
Step 6
Remove the four bolts that hold the rack to the pallet (rack base bolts).
Step 7
Remove the vertical extenders if necessary.