Cisco GainMaker Optoelectronic Node 1GHz with 40 52 MHz Split Guida All'Installazione
GainMaker Node
Mains Power Pack Kit
Installation Instructions
Mains Power Pack Kit
Installation Instructions
Overview
Audience
These installation instructions are intended for cable system operators and
installers who need to install a GainMaker Node Mains Power Pack Kit.
Introduction
The GainMaker Node Mains Power Pack Kit allows a GainMaker node to operate
from local utility power, 100-240 VAC. It is intended for indoor applications
where the use of local utility power is required or preferred. The source of AC
power can be a nearby utility outlet or an uninterrupted power supply (UPS).
These installation instructions explain how to install the GainMaker Node Mains
These installation instructions explain how to install the GainMaker Node Mains
Power Pack Kit.
Note:
Note:
The following instructions apply to standard GainMaker Nodes, Reverse
Segmentable GainMaker Nodes, and 4-Port GainMaker Nodes.
For additional information on node installation and configuration, refer to the
appropriate node installation and operation guide.
Qualified Personnel
Only appropriately qualified and skilled service personnel should attempt to
install, operate, maintain, and service this product.
WARNING:
Allow only qualified and skilled personnel to install, operate, maintain, and
Allow only qualified and skilled personnel to install, operate, maintain, and
service this product. Otherwise, personal injury or equipment damage may
occur.