Cisco Headend System Release 2.5 Guida All'Installazione

Pagina di 280
78-738190-01 Rev B 
SR 2.5/3.5 Direct ASI Installation and Configuration Procedures 
I-27 
Stop the BFS and OSM Processes,
 Continued 
 
  3. 
Type 2 (for Startup / Shutdown Single Element Group) and then press 
Enter
Result:  The Dncs Control window updates to show all the servers and 
processes running on the DNCS. 
 
  4. 
Type the number associated with BFS Server and then press Enter
Result:  The Dncs Control window updates to display a message 
prompting you to enter the target status for the entire element group or to 
type E to display the individual elements of the group. 
  5. 
Type 1 (for stopped) and then press Enter
Result:  A confirmation message appears.