Cisco Cisco Tidal Enterprise Scheduler 6.2 Guida Utente
9-287
Cisco Tidal Enterprise Scheduler 6.2 User Guide
6.2.1
Chapter 9 Variables
Variables Interface
n
Using
– This field displays only when the
Specific Date
options and the
Fiscal
period options are selected in the
Starting with
field. This field varies according to
the option selected in the
Starting with
field.
Job’s Actual Run Date
The date that the job actually runs. This may be
different than the scheduled date due to
production carryover.
different than the scheduled date due to
production carryover.
Job’s Scheduled Date
The date assigned to a job to run.
Last Sunday
The Sunday that occurred before the current date.
Last Monday
The Monday that occurred before the current date.
Last Tuesday
The Tuesday that occurred before the current date.
Last Wednesday
The Wednesday that occurred before the current
date.
date.
Last Thursday
The Thursday that occurred before the current
date.
date.
Last Friday
The Friday that occurred before the current date.
Last Saturday
The Saturday that occurred before the current
date.
date.
Specific Date (m/d/yy)
A date is specified within a designated year.
Specific Date (m/d)
A date is specified within the current year.
Fiscal Month
The current month within a selected fiscal year.
Fiscal Week
The current week within a selected fiscal year.
Fiscal Quarter
The current quarter within a selected fiscal year.
Fiscal Year
The current year within a selected fiscal year.
Calendar Month
The current calendar month.
Table 9-1
Date Calculation Options
Date Calculation Starting Points
Definition