Cisco Cisco StadiumVision Director Manuale Di Manutenzione
© 2011 Cisco Systems, Inc. All rights reserved.
Page 38 of 40
Table 5.
CLI Commands sent by the Dashboard
Command
CLI Commands Sent to Switch sjc_29_lab_gw1
Power Cycle DMP interface
Gi2/17
shutdown
no shutdown
Run cabling Test
using TDR test cable-diagnostics TDR interface Gi2/17
Show TDR Test Results
show cable-diagnostics TDR interface Gi2/17
Ping Test ping
10.10.1.1
Clear ARP Cache
clear arp-cache interface Gi2/17
Power Cycling a DMP
Send the Power Cycle DMP switch command to cycle PoE (Power over Ethernet) on
the switch port to which the DMP is connected. This will reboot the DMP. The DMP
power cycle uses PoE and sends the shut CLI command to the appropriate switch /
port based on selected DMP(s).
the switch port to which the DMP is connected. This will reboot the DMP. The DMP
power cycle uses PoE and sends the shut CLI command to the appropriate switch /
port based on selected DMP(s).
DMP 4305Gs require a special adapter to enable them to properly process
the PoE command.
the PoE command.
Power On/Power Off the DMP
Send the Power On or Power Off command to turn the power on or off on the
selected DMP(s). These commands use Power over Ethernet and send the shut CLI
command to the appropriate Switch / port based on selected DMP(s).
selected DMP(s). These commands use Power over Ethernet and send the shut CLI
command to the appropriate Switch / port based on selected DMP(s).
Running a Cable Test Using TDR
Send the Run Cable Test Using TDR switch command to invoke a Time Domain
Reflectometer (TDR) test for a specific switch port. This test helps you to confirm the
integrity of the port and cable connection to the DMP. Suitable CLI is sent to the
switch to which the DMP is connected.
Reflectometer (TDR) test for a specific switch port. This test helps you to confirm the
integrity of the port and cable connection to the DMP. Suitable CLI is sent to the
switch to which the DMP is connected.
Showing TDR Test Results
Send the Show TDR Test Results switch command to display the results of the
previously executed TDR Test command.
previously executed TDR Test command.
Sending a Ping from the Switch to the DMP
Send the Ping Test switch command to send a ping to a DMP from the switch to
which it is directly connected. The output from the switch as a result of the ping test is
displayed on the Console tab below the DMP Details window.
which it is directly connected. The output from the switch as a result of the ping test is
displayed on the Console tab below the DMP Details window.