Cisco Cisco 1 GHz GainMaker Amplifier Guida All'Installazione

Pagina di 132
Chapter 2    Installation and Configuration 
 
 
 
 
To install a power director, refer to the systems design print to determine AC power 
routing and install the AC shunt power directors in the required locations. 
Close the housingRefer to To Close the Node Housing (on page 39). 
 
 
 
38 
OL-31155-01