Adam Equipment gbc-gfc series Manuale Utente

Pagina di 36
 
P a g e
 7  
                     
© Adam Equipment Company 2011
 
 
3.3 
SETTING
 
UP
 
THE
 
SCALES
 
 
The pillar is attached to the base using a bracket that must be attached 
to the base frame first using the 4 bolts supplied.  The pillar is secured 
to  the  bracket  using  2  sets  of  screws.    The  cable  from  the  base  to  the 
indicator  module  is  run  through  the  tube  and  taken  out  through  the 
plastic support at the top.  Excess cable can be stored within the tube.   
 
 
The  GBC/GFC  Series  comes  with  a  stainless  steel  platform  packed 
separately. Place the platform in the base. 
 
 
Level the scale by adjusting the four feet. If the scale rocks re-adjust the 
feet. 
 
 
 
 
Attach  the  indicator  module  to  the  pillar  by  sliding  it  over  the  bracket 
with the flanges engaged in the groves on the base.   Attach the cable 
from the base to the connector on the rear of the indicator. 
 
 
Attach  the  power  to  the  indicator.  Press  the  [On/Off]  key  which  is  at 
the  rear  of  the  indicator.  The  software  revision  number  will  be 
displayed  followed  by  a  self-test  showing  all  digits  before  the  zero  is 
displayed along with the unit of weight that was selected last.