Sony Ericsson DFP-R3000 Manuale Utente

Pagina di 100
7-1
DFP-3000
7.
Overall systems check and listening test.
The basic installation, alignment, and test of the DFP-3000 Cinema Processor System is now complete.
Before signing off on the job, the installer will want to play familiar reference films and listen in the
house to confirm that all is well. It might also be a good idea to repeat the synchronization test of 6.13
with actual film. Adjust the fine lipsync if necessary; using the front panel for this will require the
“SDDS” password.