Mitsubishi 4g6 Manuale Utente

Pagina di 106
ENGINE <4D6> -
Timing Belt B
11C-30
TIMING BELT B
11200460113
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
D Crankshaft Pulley Removal and Installation
(Refer to P.11C-15.)
D Engine Mount Bracket Removal and Installation
(Refer to GROUP 32.)
D Timing Belt Removal and Installation
(Refer to P.11C-26.)
(Engine oil)
48 Nm
19 Nm
108 - 127 Nm
1
2
3
4
5
Removal steps
1. Idler pulley
A
A
" "
B
A 2. Crankshaft sprocket
3. Flange
4. Timing belt tensioner
A
B
" "
A
A 5. Timing belt B
REMOVAL SERVICE POINTS
A
A
"
CRANKSHAFT SPROCKET REMOVAL
Crankshaft
sprocket
MB991385
MB991367