INSTALLER SYSTEM TEST
Use the Installer System Test to check the thermostat 
operation. Refer to Table 4 for a list of the available 
system tests.
CAUTION
Equipment Damage Hazard.  
Minimum compressor off-time is bypassed 
during Installer System Test.
Avoid cycling compressor quickly.
To start the system test:
Press and hold the increase   and decrease   keys at 
the same time until 10 appears. All segments of the 
display will be displayed before the 10 appears. 
See Fig. 13 and 14.
Table 4. Tests Available In Installer System Test.
 
Fig. 14. Display of all LCD segments.
Fig. 15. Display of test number.
Refer to Table 5 for the directions and results of the 
specific tests.
NOTE: Press Time 
∆ to advance to the next test and 
Time 
∇ to go back to the previous test. Press 
Run Program to exit the system test.
Table 5. Installer System Test Options.
NOTE: Press any key and the displayed numbers change. Press Time 
∇ to go to the previous test and Time ∆ to go to 
the next test. The Run Program key will not exit this test. Press Time 
∆ or Time ∇ and then the      
Run Program key to exit.
Test 
Number
System Test Description
10-19
Heating equipment can be turned on and off.
30-39
Cooling equipment can be turned on and off.
40-49
Fan equipment can be turned on and off.
60 0 to
60 19
Keyboard keys test.
M19014
Mon
Wake Leave
Return
Sleep
Room
Wait
System
Heat
Off
Cool
AM
PM
Hold for
Heat
Cool
Repl Batt
Recovery
DST
Tue Wed Thu Fri Sat Sun
Days
Temporary Setting
Set Program Set Day/Time
M14612
Keys to 
Press
Test 
Number
Description
Heating Equipment System Test
Time
 
∆ 
10
Enter heating equipment system test.
11
Heat comes on. When Installer Setup number 2 is 1, the system fan is also energized.
10
Heat and system fan turn off.
Cooling Equipment System Test
Time
 
∆ 
30
Change from heating to cooling equipment system test. 
31
Cool and system fan come on.
30
Cool and system fan turn off.
Fan Equipment System Test
Time
 
∆ 
40
Change from cooling to fan equipment system test.
41
Fan comes on.
40
Fan turns off.
Key Operation System Test
Time
 
∆ 
60 2