Cisco CATALYST 4000 SUPERVISOR I RJ45 Guida Specifiche
© 2005 Cisco Systems, Inc. All rights reserved.
Important notices, privacy statements, and trademarks of Cisco Systems, Inc. can be found on cisco.com.
Page 2 of 5
Milestone
Definition
Date
End of Routine
Failure Analysis Date
Failure Analysis Date
The last possible date a routine failure analysis may be performed to determine the cause of
product failure or defect.
product failure or defect.
July 26, 2005
End of New Service
Attachment Date
Attachment Date
For equipment and software that is not covered by a service-and-support contract, this is the last
date to order a new service-and-support contract or add the equipment and/or software to an
existing service-and-support contract.
date to order a new service-and-support contract or add the equipment and/or software to an
existing service-and-support contract.
July 26, 2005
End of Service
Contract Renewal
Date
Contract Renewal
Date
The last date to extend or renew a service contract for the product. The extension or renewal
period cannot extend beyond the last date of support.
period cannot extend beyond the last date of support.
July 26, 2008
Last Date of Support
The last date to receive service and support for the product. After this date, all support services for
the product are unavailable and the product becomes obsolete.
the product are unavailable and the product becomes obsolete.
July 26, 2009
Table 1b.
Product Part Numbers Associated to Table 1a
End-of-Sale Product
Part Number
Part Number
Product Description
WS-X4012=
Catalyst 4000 Supervisor Engine I, Console (DB-25)/Mgt. (RJ-45) (Spare)
WS-X4014
Catalyst 4000/4500 Supervisor Engine III (2 GE), Console (RJ45)
WS-X4014=
Catalyst 4000/4500 Supervisor Engine III (2 GE), Console (RJ45) (Spare)
WS-C4003-S1
Catalyst 4000 Chassis (3-slot), Supervisor Engine1 AC P/S, Fan Tray
WS-C4003-S1-82
Catalyst 4003 Chassis, AC P/S, Supervisor Engine I, 80 10/100 FE + 2 GE
WS-C4003=
Catalyst 4000 Chassis (3-slot), Single AC Power Supply (Spare)
WS-C4006-S3*
Catalyst 4000 Chassis (6-slot), Supervisor Engine III with 2 GE, 2 AC P/S, Fans
S4KL3-12112EW
Cisco IOS Software Basic Layer 3 Catalyst 4000/4500 Supervisor Engine III and Supervisor Engine IV (RIP, St. Routes,
IPX, AppleTalk)
IPX, AppleTalk)
S4KL3-12112EW=
Cisco IOS BASIC L3 Cat4000 SUP III/IV (RIP, St. Routes, IPX, AppleTalk)
S4KL3E-12112EW
Cisco IOS ENHANCED L3 Cat4000 SUP III/IV (OSPF, IGRP, EIGRP)
S4KL3E-12112EW=
Cisco IOS ENHANCED L3 Cat4000 SUP III/IV (OSPF, IGRP, EIGRP)
*
Cisco is not announcing end of sale for the Cisco Catalyst 4006 Switch as part of this bulletin. This bulletin pertains only to the Catalyst 4006 bundle that
includes Cisco Catalyst 4000/4500 Supervisor Engine III.
includes Cisco Catalyst 4000/4500 Supervisor Engine III.
Table 2a.
End-of-Life Milestones and Dates for WS-C4003-S1-DC and WS-C4006-S3-DC. Please refer to Table 2b for more
information on the related products.
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the end of sale and end of life of a product is announced to the general public.
January 26, 2004
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no
longer for sale after this date.
longer for sale after this date.
May 3, 2005
Last Shipment Date
The last-possible date that Cisco and/or its contract manufacturers will ship the affected product.
August 3, 2005
End of Software
Maintenance Releases
Date
Maintenance Releases
Date
The last date that Cisco Engineering may release any final software maintenance releases or bug
fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product
software.
fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product
software.
May 3, 2006