SANUS ELM806 PowerBridge® Manuale Proprietario

Pagina di 2
Total Solution Connector Kit
   ELM806
Power Extension Cable Management
Tools for Installa
Not Included
Stud Finder
Flat-Blade 
Drywall Saw
 THIS PRODUCT IS NOT TO BE INSTALLED, DIRECT WIRED, OR BRANCHED TO THE BUILDING ELECTRICAL CIRCUIT/WIRING SYSTEM !
DO NOT MODIFY OR ALTER ANY PORTION OF THE COMPONENTS OF THE FACTORY ASSEMBLED APPLIANCE
  
Do not install this product near water, example, near a sink, tub, shower, swimming pool or laundry area.
Manufacturer is not liable for damages due to improper installation methods not followed herein.
This product does not have built-in electronic circuitry for surge protection or A/C filtering.
It is recommended that this product be connected to a quality surge-protector/power conditioner for equipment protection.
Disclaimer.
 
Milestone AV Technologies, it's agents, suppliers, and affiliates, shall not be liable for any damages, not limited to; misuse, acts of nature, 
verbal and written expression and improper installation. Improper installation is determined such to include, not limited to, non-code compliant installation, product 
modifications, alterations, adjustments, and substitutions of components or materials. 
Limited 2-year Warranty from Manufactures Defects: The ELM806 has a Limited Two Year product warranty against manufacturer's defects.  
If you have any questions or experience any problems with this product, please contact Customer Service.
Step 1
Loca
all Cutout
PowerOUT - Determine TV wall mount bracket loca
Align between wall framing studs. 
Use stud finder to determine in-wall obs
tween 
framing both VERTICALLY and HORIZONTALLY.
Install in any dir
t/le
ontal or v
al below,
above, next to TV wall bracket.
PowerIN - Align with upper PowerOUT within same stud-bay 
no more than 60” apart. 
Install within 60” from an exis
er outlet or power-surge device. 
Use supplied template sheet to mark area to cut out from drywall. 
Use a level to maintain proper alignment.
Carefully use drywall saw to cut along outside of line.
Horizontal 
                  or V
al
Do not exceed more
than 60” apart
Do not exceed more
than 60” apart from
exis
t or
surge-prot
PowerOUT
PowerIN
 
Milestone AV Technologies intent is to make this manual accurate and complete. However, Milestone makes no claim that the information contained herein covers all details, conditions, or 
variations. Nor does it provide for every possible contingency in connection with the installation or use of this product. The information contained in this document is subject to change 
without notice or obligation of any kind. Milestone makes no representation of warranty, expressed or implied, regarding the information contained herein. 
 
ETL LISTED
CONFORMS TO
UL STD 514C
CERTIFIED TO
CAN/CSA STD C22.2 NO.42.1
3183743
Part No. 115-2
MODEL #TSCK
Patent Pending
|
Kit Includes:
 
Slimline 3D Design In-Wall Power Cable Panels
72” Powerwire Prewired PowerOutlet | 12” Powerwire Prewired PowerInlet 
Pre-wired PowerConnectors | 72” PowerConnect Supply Cord  
ELM806 can only be installed
within standard cons
alls. 
Only attempt installa
2x4 or 2x6 wood/metal stud
framed wall.
!
!
CABLE
 Ultra Low Profile In-Wall System
POWER
3
D
PowerOUT Panel
PowerIN Panel
If insula
xists, remove or push
completely away from the openings
to allow flush moun
operly.
LEVEL
!
Level
SANUS • 6436 City West Parkway • Eden Prairie, MN  55344  USA
Customer Service: 800-359-5520 • 952-225-6013 • info@sanus.com • sanus.com
©2012 Milestone AV Technologies, a Duchossois Group Company. All rights reserved. Sanus is a division of Milestone.
All other brand names or marks are used for identification purposes and are trademarks of their respective owners.