Axiometric LLC GW2C-AC Manuale Utente
Axiometric Gateway Guide
MeshPlus™
POE Injector
The Gateway 2 requires an external AC (110-220VAC
50/60Hz) or DC (POE or Solar) power source and should be
mounted in a location with convenient access to power.
When using solar power, the solar panel should be angled
towards the sun in the South to gather maximum energy.
When using Power Over Ethernet (POE), the DC source
voltage should be adjusted based on the length of the Ethernet
cable to deliver approximately 12vdc to the Gateway 2. An
un-interruptible power source (UPS) should be used with the
POE DC power source at the injector.
50/60Hz) or DC (POE or Solar) power source and should be
mounted in a location with convenient access to power.
When using solar power, the solar panel should be angled
towards the sun in the South to gather maximum energy.
When using Power Over Ethernet (POE), the DC source
voltage should be adjusted based on the length of the Ethernet
cable to deliver approximately 12vdc to the Gateway 2. An
un-interruptible power source (UPS) should be used with the
POE DC power source at the injector.
Based on the network bridge function selected (Ethernet, WiFi, POTS, or Cellular), the
gateway should be mounted with clear access to the remote network. For example, a
Gateway 2 with WiFi bridge option should be mounted with an unobstructed view of the
WiFi access point it will communicate with; similarly, a Gateway 2 with Cellular bridge
option should be mounted with an unobstructed view of the cell tower it will
communicate with.
gateway should be mounted with clear access to the remote network. For example, a
Gateway 2 with WiFi bridge option should be mounted with an unobstructed view of the
WiFi access point it will communicate with; similarly, a Gateway 2 with Cellular bridge
option should be mounted with an unobstructed view of the cell tower it will
communicate with.
c) Startup
Once configured and mounted, the following steps should be followed to start Gateway
2 operation:
2 operation:
1. With external power disconnected
remove the four bolts that secure the
Gateway 2 front panel; carefully
remove the panel and install a UM-1
lithium battery (Tadiran Pulses Plus
recommended) in the battery clip on
the right side of the gateway.
Connect the battery connector to the
Gateway 2 main board header JP3
observing the polarity of the header.
The LEDs on the Gateway 2 Mesh
Stamp should illuminate and begin
blinking.
Gateway 2 front panel; carefully
remove the panel and install a UM-1
lithium battery (Tadiran Pulses Plus
recommended) in the battery clip on
the right side of the gateway.
Connect the battery connector to the
Gateway 2 main board header JP3
observing the polarity of the header.
The LEDs on the Gateway 2 Mesh
Stamp should illuminate and begin
blinking.
Lithium backup battery