Microheat MHRF72406 Manuale Utente
10/31/2006
11
Installation / Operation Manual HotShot MH-35 RF
Bypass Valve Installation Steps
(Required for Dual Washer
Systems)
For vehicles with 1 washer pump for both front and rear washer operation
Bypass Valve Installation Kit P/N: MH34-SAK
Bypass Valve Installation Kit P/N: MH34-SAK
1. Disconnect or cut the washer hose between washer pump and nozzles as close as
possible (no closer than 2”) to washer pump.
2. Insert one check valve in-line (washer pump side) making sure the gray side is pointing
away from the washer pump.
3. Attach a 2” section of the supplied rubber hose to the outlet of the one-way valve. Attach
the supplied tee to the other end of the hose.
4. Route a section of the supplied rubber hose from the other end of the tee to the Hotshot
inlet.
5. On the washer reservoir, drill a 5/16” hole in the filler tube about ½” from the top and
install the supplied rubber grommet in the hole just drilled.
6. Open the washer reservoir cap and insert one end of the hard plastic hose down the filler
tube of washer reservoir. Cut the end of hose that will descend to the bottom of the tank
at a 45° angle ensuring it is at least 1” shorter than the depth of the reservoir. This will
prevent the unit from sucking in debris at the bottom.
at a 45° angle ensuring it is at least 1” shorter than the depth of the reservoir. This will
prevent the unit from sucking in debris at the bottom.
7. On the inside of the washer reservoir filler tube, connect one end of the 90º elbow to the
top of the hard plastic tube and push the other end of the 90º elbow through the 5/16”
rubber grommet installed in step 5.
rubber grommet installed in step 5.
8. Connect a 2” piece of the supplied rubber hose to the end of the 90º elbow that was
pushed through the rubber grommet.
9. Connect the other end of the 2” piece of rubber hose to the remaining one-way valve with
the gray side pointing away from the washer reservoir.
ADDITIONAL PARTS INCLUDED IN KIT
1 Check valve
2 feet (24”) of rubber hose
2.5 feet (30”) hard plastic hose
1-3/16 Straight coupling
1-3/16 Tee (Plastic Barbed)
1-3/16 90º Elbow (Plastic Barbed)
5 Wire ties
1-5/16” Rubber Grommet
1 Check valve
2 feet (24”) of rubber hose
2.5 feet (30”) hard plastic hose
1-3/16 Straight coupling
1-3/16 Tee (Plastic Barbed)
1-3/16 90º Elbow (Plastic Barbed)
5 Wire ties
1-5/16” Rubber Grommet