ZXSDR BS8800 C200 Installation Manual
Note:
According to detailed equipment environment (for example,
cabinet installation position, jumper length on the cabinet top,
arrester configuration or arrester rack installation position), the
bending radius requirement of main feeder and the beautiful
requirement of cable layout in the equipment room, select a
cutting position of main feeder cable.
4. Make an indoor connector of main feeder.
5. Connect the main feeder with an arrester.
Note:
For an arrester without ground cable, during installation,
connect the arrester to the main feeder directly.
For an arrester with an arrester rack, during installation,
adjust every main feeder carefully. Make sure a screw fas-
tener connected well which connects the main feeder con-
nector with the arrester.
E
ND OF STEPS
.
Installing Top-equipment Jumper
Context
The requirements of jumper installation are as follows:
Jumper layout from cabinet top to cable tray should be parallel
and orderly, but not crossed.
During routing, the jumper must pass through the cable tray
inner to its upper side. Prohibit jumping the cable tray outsides
directly.
The bending of jumper is reasonable and natural. Suggest that
the bending radius of jumper should be twenty times more than
its diameter.
During layout from cabinet top to cable tray, the tensile
strength for the jumper should be moderate.
The jumper should be bound with every rail of cable tray. The
directions of all wire fasteners keep consistent and after bind-
ing, the wire fasteners are cut flatly.
Labels must be affixed to all indoor jumpers at a 100 mm dis-
tance from both ends of jumper.
Steps
1. The jumper passes through a wiring slot on the top of cabinet.
2. Connect a DIN connector of feeder to an ANT interface of RSU.
3. Connect the other DIN connector of jumper to a DIN connector
of feeder.