ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
Chapter 7 Installing GPS Antenna Feeder System
a waterproof protection at the back of GPS mounting panel as
well as at the junction of GPS feeder and GPS antenna.
6. Fix the GPS feeder with the binding tape and cut a redundant
part flatly after binding.
E
ND OF STEPS
.
Installing GPS 1/4” Feeder Grounding
Kit
Prerequisite
1. Complete the installation and routing of GPS feeder.
2. Prepare installation materials and tools.
The installation materials include:
Grounding kit (tinning copper braid attached)
Two M6×25 hexagon head screw (spring washer and
plain washer attached)
One M8×25 hexagon head screw (spring washer and
plain washer attached), used to connect the ground ca-
ble and ground bar.
Assembled 1/4" feeder ground cable
A package of tung oil (10 ml).
The installation tools include:
Electrical knife
M6 screwdriver
M8 screwdriver.
Context
Only install the GPS 1/4" feeder grounding kit before the feeder
comes into the equipment room, and do not allow to install it at
other any positions.
The structure of GPS 1/4" feeder grounding kit is as shown in
Fig-
.
Confidential and Proprietary Information of ZTE CORPORATION
75