ZTE Corporation RSU60EGU858 Manuale Utente

Pagina di 37
ZXSDR RSU60E User Manual
4.5.3 Installing Optical Fibers Between BBU and RSU
Prerequisites
l
The ESD wrist strap must be worn.
l
The baseband power cabinet and the RF cabinet have been independently installed.
Context
When the baseband power cabinet and the RF cabinet are installed side by side or they
are far away from each other, you need to connect BBU and RSU using optical fibers.
Pay attention to the following points when installing optical fibers:
l
Do not damage the optical fiber cladding during operations.
l
Protect optical fiber connectors and avoid contaminating them.
l
Do not forcibly bundle optical fibers.
l
Curve optical fibers at the turning.
Steps
1.
Affix a temporary label.
Affix temporary labels to both ends of the new optical fiber to set up a mapping. If
more than one optical fiber needs to be installed, use different labels to differentiate
optical fibers.
2.
Route optical fibers.
a. Optical fibers go out from the side waterproof module of the baseband module and
go through the routing apertures on the base.
b. Then, optical fibers go through the routing apertures on the base of the RF cabinet,
traverse the waterproof modules, and connect to the six optical interfaces for RF
modules.
3.
Insert optical fiber connectors.
Insert optical fiber connectors according to the mapping on temporary labels.
Caution!
Insert optical fiber connectors tightly.
4.
Bundle optical fibers.
Bundle and secure optical fibers along the routing troughs, which complies with
relevant regulations.
5.
Affix an engineering label to an optical fiber.
Remove the temporary label for the optical fiber and affix an engineering label.
4-20
SJ-20110823164828-001|2011–08–16
ZTE Proprietary and Confidential