ZTE Corporation ZXG-BTS2 Manuale Utente

Pagina di 139
 
 
Chapter 4 - System Functions 
Confidential and Proprietary Information of ZTE CORPORATION 71 
F
I G U R E  
4 7
 
C
O N N E C T I O N  
A
S S I G N M E N T
 
 
MS 
LAPD
FURRM 
HPIMa
LAPD 
BSC 
OAMM 
DATA REQ 
(ASSIGN CMD)  
DL_DATA_IND (DATA REQ 
(ASSIGN CMD)) 
Dm_DL_DATA_RE
Q (ASSIGN CMD) 
(ASSIGN 
CMD) 
O
ld
 channel
 
DATA IND 
(ASSIGN FAIL)  
DL_DATA_REQ (DATA IND 
(ASSIGN FAIL)) 
Dm_DL_DATA_IN
D (ASSIGN FAIL) 
(ASSIGN 
FAIL) 
DATA IND 
(ASSIGN COMP)  
DL_DATA_REQ (DATA IND 
(ASSIGN COMP)) 
Dm_DL_DATA_IN
D (ASSIGN 
COMP) 
(ASSIGN 
COMP) 
O
ld
 channe
New c
h
a
nnel
 
 
 
The wireless link is changed in the same cell. 
The BSC commands the BTS activation through a simple 
request/acknowledgement procedure (see the CHAN ACTIV and CHAN 
ACTIV ACK of the “access” procedure).Once the BTS is activated, the 
BSC commands the MS to perform channel change through the (RR) 
ASSIGNMENT COMMAND message. When the MS changes its settings 
according to the new information and establishes a new signaling link, 
the MS sends a (RR) ASSIGNMENT COMPLETE message to the BSC. If 
the MS cannot implement the connection allocation for some reasons, 
it will send the (RR) ASSIGNMENT FAILURE message on the original 
channel. 
The FURRM transfers transparently the (RR) ASSIGNMENT COMMAND, 
(RR) ASSIGNMENT COMPLETE and (RR) ASSIGNMENT FAILURE 
messages. 
Encryption 
The encryption is shown in Figure 48.