ZTE Corporation ZXG-BTS2 Manuale Utente

Pagina di 139
 
ZXG10-BTS (V2.9) Technical Manual 
76 
Confidential and Proprietary Information of ZTE CORPORATION  
The BTS power control is optional, which is indicated by the 
parameters in the MS POWER CONTROL or CHAN ACTIV message. By 
changing the frame header of the power level L1 that is sent to the MS, 
the TRX tries to control the power control parameter within certain 
range according to the message requirement (the CHP module 
implements this operation). 
When the BTS is executing the MS power control, the BSC can change 
the MS power parameters during the connection (caused by a level 
change of the MS power for example). 
The MS POWER CONTROL and CHAN ACTIV messages must contain an 
MS-allowed maximum power value. 
The procedure of BS power control executed by the BSC is shown in 
Figure 54. 
F
I G U R E  
5 4
 
B S   P
O W E R  
C
O N T R O L
 
 
MS 
LAPDm 
FURRM 
HPIMa
LAPD 
BSC 
OAMM 
(BS POWER 
CONTROL)  
DL_DATA_IND (BS POWER 
CONTROL) 
MPH_RRCmdToC
HP(CHP SET BS 
POWER)  
 
 
This optional procedure can have the BSC set the TRX transmission 
power level or the parameter that the TRX uses to control the TRX 
transmission power. 
The initial parameters are set in the CHAN ACTIV message by the BSC. 
If these parameters are to be changed, the BSC will send the BS 
POWER CONTROL message to the TRX. 
The BTS power control is optional, which is indicated by the 
parameters in the BS POWER CONTROL or CHAN ACTIV message. By 
changing the transmission power, the TRX tries to control the power 
control parameter within a certain range according to the message 
requirement (the CHP module implements this operation). 
The maximum power of the TRX is determined by the network design 
specifications, but the BSC can specify a smaller maximum power 
value in the BS POWER CONTROL and CHAN ACTIV messages. 
3. Physical environment request/acknowledgement 
The procedure of physical environment request/acknowledgement is 
shown in Figure 55.