Chapter 3  Error! Style not defined. 
Confidential and Proprietary Information of ZTE CORPORATION      29 
F
I G U R E  
2 3
 
Z X M B W
 
E 9 2 0 0
 
I
N S T A L L A T I O N  
F
L O W
 
Begin
End
Cabinet
Installation
Hardware installation
check
-
Power-up and
Power-down Test
-
Cables
Installation
Installation
preparation
Main antenna system
Installation
 GPS antenna system
Installattion
 
Installation Precautions 
The installation engineer should check the working environment 
before starting the installation. The installation engineer must be 
familiar with the installation position, networking, data 
configuration and cables of ZXMBW E9200. 
Besides, pay attention to the following:  
 
Operations on the ZXMBW E9200 are forbidden if the cabinet 
is powered on. 
 
Installing the outdoor antenna feeder system is forbidden 
during rainy and lightning situations.