Chapter 4 Power and Grounding Cables Installation 
 
Confidential and Proprietary Information of ZTE CORPORATION      31 
Grounding Cable Installation 
Usually, the user  must be responsible for completing the basic 
ground grid construction of the grounding system, the grounding 
work of  the iron tower and buildings, and the connection point 
construction of the indoor/outdoor grounding busbars. The on-
site engineers need to install the enclosure PE cable of the RA25 
chassis. The RA25 enclosure has no PE terminal, as shown in 
Figure 22.  
F
I G U R E  
2 2
 
C
H A S S I S  
P E
 
C
A B L E  
I
N S T A L L A T I O N  
S
C H E M A T I C  
D
I A G R A M  
 
2
1
 
 
1 Chassis PE terminal  2 Grounding terminal 
Figure 23 shows the structure of the grounding cable. 
F
I G U R E  
2 3
 
C
H A S S I S   
G
R O U N D I N G  
C
A B L E  
S
T R U C T U R E
 
 
 
This cable is made of a 35 mm
2
 yellow/green copper wire, with 
round metallic bare terminals (also known as lugs) crimped on 
both ends.  
End A of the grounding cable  must be connected to the PE 
terminal of the chassis, while end B can be connected in the 
following two ways: