Chapter 6 Main Antenna Feeder System Installation 
 
Confidential and Proprietary Information of ZTE CORPORATION      43 
the outdoor lightning protection grounding cable has been 
connected to the position,  and if the it has a sectional area 
greater than 50 mm
2
.  
Pole and support 
The antenna support and pole must have been installed 
according to the engineering design requirements. The 
firmness and wind resistance of the support and pole  must 
comply with the design requirements.  
Connecting the feeder 
The cables must have been installed according to the 
engineering design. Usually, the drilling on the walls and 
ceiling required for the installation of the outdoor wiring rack 
and feeder entry window must be completed by the network 
operator as a condition of the equipment room, since it 
involves the infrastructure of the equipment room.  
The outdoor construction of the antenna feeder  must be 
carried out in the sunny daytime without strong wind.  
Safety Measure Check 
The personnel working on the tower must use safety belts.  
They  must not wear loose clothes or slippery shoes when 
working on the tower.  
The personnel working under the tower must wear helmets.  
Obvious signs  must be set up in the installation site to notify 
irrelevant people to keep away from the site.  
The personnel under the tower are responsible for urging 
irrelevant persons, especially kids to stay away from the 
construction site.  
Tools and metallic installation parts temporarily not used on 
the tower  must be reliably put into the canvas tool bag, 
which  must be opened only when taking tools from it and 
closed immediately after.  
Installation Tools Preparation 
The installation tools include:  
Measurement tools 
Compass, multimeter, angle meter, and tape; 
Lifting tools 
Pulley, and rope for drawing the main feeder; 
Special-purpose tools