ZTE Corporation ZXMBW-RA25 Manuale Utente
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
60
Confidential and Proprietary Information of ZTE CORPORATION
1. Check the labels at both ends (0.3 m) of the primary feeder
to ensure that it is the right cable.
2. Wrap the main feeder connector with a piece of flax or an
antistatic plastic bag filled with foam, and then bind it tightly
with cable ties.
with cable ties.
3. Knot the hoisting rope at the place about 0.4 m away from
the connector and knot the rope again at the place about 3.4
m away from the connector to allow cooperation between
personnel on the tower and ground and protect the feeder
and its connector from being damaged by hitting the tower.
m away from the connector to allow cooperation between
personnel on the tower and ground and protect the feeder
and its connector from being damaged by hitting the tower.
4. After the feeder has been hoisted to the tower top, fasten it
tightly at multiple points to prevent it from sliding from the
tower.
tower.
E
ND OF STEPS
Main Feeder Laying and Fixing
n
Laying requirements
„
The main feeder must be laid in good order, without
crossing.
crossing.
„
Learn its route before connecting the main feeder. You
are recommended to mark the actual route on the
drawing to avoid reworks due to crossings of the main
feeder.
are recommended to mark the actual route on the
drawing to avoid reworks due to crossings of the main
feeder.
„
The minimum bending radius of the main feeder must be
no less than 20 times of the radius of the main feeder.
The radius of a single bend must not be less than 90 mm.
The minimum bending radius of repeated bends must be
200 mm.
no less than 20 times of the radius of the main feeder.
The radius of a single bend must not be less than 90 mm.
The minimum bending radius of repeated bends must be
200 mm.
„
Spacing of the triple feeder clip: 1.65 m for the maximum.
n
Main feeder connecting steps:
1. Triple feeder clips must be installed in advance along the
tower or cable rack at spacing of about 1.5 m. The spacing
can be lengthened or shortened depending on the actual
situation, but must not exceed 1.65 m. The spacing between
the triple feeder clips must be as even as possible and in the
same direction. If two rows of feeder clips are installed on
one cabling ladder, keep them in parallel and in good order.
Figure 44 shows a triple feeder clip.
can be lengthened or shortened depending on the actual
situation, but must not exceed 1.65 m. The spacing between
the triple feeder clips must be as even as possible and in the
same direction. If two rows of feeder clips are installed on
one cabling ladder, keep them in parallel and in good order.
Figure 44 shows a triple feeder clip.