Chassis Installation Check
n
The chassis installation position must match that on the
design drawing.
design drawing.
n
The chassis must be installed securely, meeting the level 7
earthquake-resistant requirement.
earthquake-resistant requirement.
n
The horizontal and vertical deviation of the chassis must be
less than 3 mm.
less than 3 mm.
n
The surface must be clean and the paint must be in good
condition. No part must fall off or get damaged. Signs on the
chassis must be correct, clear and complete.
condition. No part must fall off or get damaged. Signs on the
chassis must be correct, clear and complete.
n
The inside of the chassis must be clean. The corners inside
the chassis must be free from messes such as metallic scraps
and wires.
the chassis must be free from messes such as metallic scraps
and wires.
n
All bolts must be tightened. No plain washer or spring
washer is placed in reverse.
washer is placed in reverse.