Powerwave Technologies Inc. KRB1011108 Manuale Utente

Pagina di 42
© 2001 – Ericsson Amplifier Technologies Inc.
6
2.  INSTALLATION
2.1  Introduction
This section contains receiving, unpacking and installation recommendations for the
Ericsson Amplifier Technologies MCPA subrack assembly.  Carefully read and review
all of the information contained in this section before attempting to install or operate the
subrack assembly.  In addition, read and review the operating instructions contained in
Section 3 before operating the equipment.
CAUTION
The subrack assembly is specifically designed for use with
Ericsson Amplifier Technologies Multicarrier Power
Amplifiers (MCPAs).  Refer to the Installation, Operation and
Maintenance instructions included with the companion
MCPA before operating this equipment.  Improper operation
of this equipment may cause damage to it, or to the
equipment connected to it.
2.2  Electrical Service Recommendations
It is recommended that each 400-Watt subsystem power source be equipped with one
of the circuit breaker configurations shown in Figure 2, installed in a load center with a
master mains switch or breaker.  This arrangement permits service and maintenance of
the subrack assembly without the necessity for removing power to the entire site, and
ensures continuous coverage in the event that one of the two circuit breakers should
trip.
Figure 2.  Recommended Circuit Breaker Configurations
75 A
75 A
75 A
75 A
150 A
300 A
150 A