5.
AN-50 Terminal Installation
This section describes the easy steps to follow to install the AN-50 terminal and
associated equipment. Figure 3 illustrates the three primary cables that are
required to complete the installation including; Power, IF and CAT 5 (not
included). The power cord connects to a standard North American 120 VAC
power outlet, the IF cable connects the terminal (located indoors) to the
transceiver (located outdoors), and the CAT 5 which connects the terminal to a
switch or router for interface to the core network.
Terminal
CAT 5 Cable
AC Power
Chord
IF Cable
Transceiver
Antenna
Pole and
Mount
Flat Plate
Antenna
Antenna
Figure 3 AN-50 installation.
The terminal is for indoor installation only while the transceiver and antenna are
mounted externally. The principal steps in installation are:
1. Conduct a general site survey
2. Install the antenna
3. Run the IF cable
4. Install the terminal
2. Install the antenna
3. Run the IF cable
4. Install the terminal
Each step is addressed in more detail below.
5.1.
General Site Survey
The first step in installing the AN-50 system is to conduct a general site survey.
Although the installation steps are relatively straightforward, they do involve
some construction and electrical work, which can be best performed by
professional installers.
The first step in installing the AN-50 system is to conduct a general site survey.
Although the installation steps are relatively straightforward, they do involve
some construction and electrical work, which can be best performed by
professional installers.