CommScope Technologies LLC IPBTS-C30-1900 Manuale Utente
Chapter 3
l
ipBTS C30 installation
Preparing for the installation
3-2
910136 Rev01.00 Standard July 2007
Preparing for the installation
This chapter contains unpacking, inspection, and installation instructions for all components of
the ipBTS. Review the preparation requirements documented in
the ipBTS. Review the preparation requirements documented in
before
proceeding with the installation.
Verify the contents of each shipping container with the packing list before beginning the
installation.
installation.
NOTE
All of the equipment has been tested, and calibrated at the factory. Retain all packing
material in the event that the unit must be returned to the factory due to damage during
shipping.
material in the event that the unit must be returned to the factory due to damage during
shipping.
Tools required for the installation
Before beginning the installation, have the following tools on hand:
•
Utility knife or box cutter
•
Appropriate wrenches to secure the ipBTS chassis to the equipment rack.
•
Appropriate RF and GPS cable connector stripping and crimping tools.
•
Appropriate stripping and crimping tools for the power and ground connections.
•
#2 Phillips head screwdriver
•
Torque wrench with appropriate SMA connector attachment for SMA cables
•
Voltage meter