Honeywell International Inc. CX85WCR Manuale Utente
Installing the Charge Rack
4-2
DIAD 6 Charge Rack Manual
Receiving Replacement Parts
To obtain replacement parts for defective Charge Rack components, please refer to the following
web site for information regarding part numbers and costs:
web site for information regarding part numbers and costs:
http://wss.inside.ups.com/sites/CRA/syse/Projects/DIAD V/Troubleshooting, FAQ, and
Procedures/DIAD V Accessories and Charging Rack Part List.pdf
Procedures/DIAD V Accessories and Charging Rack Part List.pdf
Charge Rack Installation
Scheduling the Installation
TSG, Plant Engineering, and the operating center need to coordinate the optimum time for Charge
Racks to be installed utilizing the locations that were determined during the wireless site survey
conducted by TSG. It is imperative that the DIAD 6 Charge Racks are installed in accordance with
the location determined in the wireless site survey.
Racks to be installed utilizing the locations that were determined during the wireless site survey
conducted by TSG. It is imperative that the DIAD 6 Charge Racks are installed in accordance with
the location determined in the wireless site survey.
Installation can occur well before scheduled DIAD 6 deployment provided the users can be pro-
vided a safe place to put spare DIAD 5 racks until the cutover to DIAD 6 takes place. A number
of DIAD 5 Charge Racks will remain in place to support the peak DIAD population.
vided a safe place to put spare DIAD 5 racks until the cutover to DIAD 6 takes place. A number
of DIAD 5 Charge Racks will remain in place to support the peak DIAD population.
Installation Methods
There are several methods to install the DIAD 6 Charge Rack:
• Remove the DIAD 5 Net Racks and replace them with the DIAD 6 Charge Racks.
or...
• Install DIAD 6 Charge Racks utilizing new mounting hardware in accordance with the loca-
tions agreed on during the wireless site survey conducted by TSG.
• Do not install near other equipment or machines that routinely produce conduc-
tive dust.
• DIAD 6 battery charging can be negatively affected by temperature extremes.
• A fully loaded DIAD 6 Charge Rack weighs 107.5 lbs (48.8 kg). The DIAD 6
must be installed in a location that will support the weight of the racks when
fully loaded.
fully loaded.
• Vertical mounting of the Charge Rack is not recommended.
• The DIAD 6 Charge Rack should be installed in an interior location or climate-
controlled environment that is not subject to excessive dust or moisture and is
out of direct sunlight.
out of direct sunlight.
• The ambient temperature of the mounting location for DIAD 6 Charge Racks
must remain between 32° F and 95° F (0° C and 35° C). Charging is not guar-
anteed if the ambient temperature exceeds these limits.
anteed if the ambient temperature exceeds these limits.
Unpacking and Preparing the Work Area
This section explains how to unpack items and prepare the work area before assembling the
Charge Rack. All Charge Rack parts, hardware, and tools must be close to the work area.
Charge Rack. All Charge Rack parts, hardware, and tools must be close to the work area.