Honeywell International Inc. AZWDGL Manuale Utente

Pagina di 30
 Installation and Operations Guide 
General installation guidelines
 © Honeywell 
LTBT-TM-AZWIOG
Rev. 0001BETA
  
9
 
MS/TP LAN wiring
The AZW-5000 coordinator device communicates with the BACnet system over 
the MS/TP LAN, which uses the EIA–485 signaling standard. Transceivers 
communicate with their associated unitary controllers over 
N o t e
This section applies only to the coordinator device. 
Terminating MS/TP LAN cabling
MS/TP terminations are located at the top of the AZW-5000. See Fig. 4 on p. 15.
Maintain polarity of the MS/TP wire run throughout the MS/TP LAN.
N o t e
Basic information about MS/TP terminations at the AZW-5000 are 
provided here. See the BACtalk System Design Guide (LTBT-TM-SYSDSGN) 
for more detailed information and limitations with respect to MS/TP LANs — 
distance requirements, unit loads, repeater architectures, and so on.
Ta b l e  2
 MS/TP LAN facts 
Transmission speed
9.6, 19.2, 38.4, 76.8Kbps (figured at global controller). 
At startup, AZW-5000 devices operate at 76.8 Kbps.
Layout
Bus.
Cabling
BACnet specifies the following. Shielded, twisted-pair 
cabling with characteristic impedance between 100 and 
130 Ohms. Distributed capacitance between conductors 
must be less than 30 pF/foot (100 pF/m). Distributed 
capacitance between conductor and shield must be less 
than 60 pF/foot (200 pF/m). Foil or braided shield 
acceptable.
Segment length
Segments between transceivers and controllers/devices 
should be kept as short as practical to reduce cable 
costs. Longer segments are acceptable to improve radio 
signal strength.
The segment between a coordinator and its associated 
BCM can be up to 4000 ft. (1071 m.), but will typically 
be much shorter.
Maximum devices 
overall
One coordinator and 15 transceivers/Repeaters.
Maximum devices 
per segment
One transceiver and one controller per subnet.
MS/TP repeaters
Do not use.
Terminating 
resistors
not applicable
Shield grounding
Ground transceiver shield drain wires at single point 
earth (panel) ground, not AZW-5000 ground. Tape off 
the shield drain wire at the other end.
Grounding coordinator shield wires is not necessary 
unless the coordinator is located more than ten feet 
from its associated BCM.