Planning and PreparationPlanning and Preparation
Introduction
MCPS2135 System Operation
7
2001 Spectrian Corporation. All rights reserved.
2 Planning and Preparation
2.1 Installation Planning
It is important to ensure proper planning and site preparation is complete prior to
beginning the installation of the MCPS2135. The following sections describe
installation considerations and the information required before beginning the
installation procedure. Spectrian Applications Engineering is always available to
assist with planning for the installation of the MCPS2135.
beginning the installation of the MCPS2135. The following sections describe
installation considerations and the information required before beginning the
installation procedure. Spectrian Applications Engineering is always available to
assist with planning for the installation of the MCPS2135.
1.22.2
Site Planning Guide
For each MCPS2135 cell site installation, there must be a Site Planning or Site
Engineering guide giving the detailed information on the site considerations, rack
installation, cable connections, and Radio Parameters.
Engineering guide giving the detailed information on the site considerations, rack
installation, cable connections, and Radio Parameters.
.
Note: Local building and fire codes govern the manner in which some site
preparation and installation tasks are performed. Spectrian recommends that
you consult your local building inspector or a licensed engineer to ensure that
the site installation conforms to local building codes.
preparation and installation tasks are performed. Spectrian recommends that
you consult your local building inspector or a licensed engineer to ensure that
the site installation conforms to local building codes.
2.2.1 Site Considerations
Intended Installations
The MCPS2135 system is intended for installation only in restricted access areas
(dedicated equipment rooms, equipment closets, environmental shelters, or the
like) in accordance with Articles 110-16, -17, and -18 of the National Electrical
Code, ANSI/NFPA No. 70.
(dedicated equipment rooms, equipment closets, environmental shelters, or the
like) in accordance with Articles 110-16, -17, and -18 of the National Electrical
Code, ANSI/NFPA No. 70.
Weight
The MCPS2135 shelf and each RF module weigh approximately 50 pounds (22.7
kg); the fully equipped system weighs 250 pounds (113.3 kg). The system must
be installed, using the appropriate mounting kit, into a rack capable of supporting
the unit, and located on a floor or surface capable of supporting the combined
weight of the rack, the MCPS2135, and the installer or technician.
kg); the fully equipped system weighs 250 pounds (113.3 kg). The system must
be installed, using the appropriate mounting kit, into a rack capable of supporting
the unit, and located on a floor or surface capable of supporting the combined
weight of the rack, the MCPS2135, and the installer or technician.
Floor Covering
If you intend to use a floor covering under the MCPS2135, avoid combustible
materials , industrial carpeting, and materials that will permit generation of
electrostatic charges.
materials , industrial carpeting, and materials that will permit generation of
electrostatic charges.
Illumination
The MCPS2135 is designed to be installed and serviced under normal workroom
lighting. During installation, room lighting must be bright enough to allow
reading instructions and inspection of modules, but not so bright as to interfere
lighting. During installation, room lighting must be bright enough to allow
reading instructions and inspection of modules, but not so bright as to interfere