Davis Instruments DWW6326 Manuale Utente

Pagina di 12
Preparing the Rain Collector
Page 9
4.
Check the Junction Board cable connections: SIM Sensor, SIM Power, Motor, 
Temp/Hum Sensor, and Solar Power. Refer to the figure below and also to 
the Junction Board Connections figure on page 7. 
5.
Install the Junction Board Cover as show below. The Junction Board Cover 
presses easily into place when you are installing it. To remove the cover, 
press gently in on both sides to release the latches holding it in place.
6.
Slide the two sections of the Radiation Shield completely together.
7.
Place the flat washers, lock washers and plastic wing nuts over the 
threaded rods.
8.
Finger-tighten the wing nuts until they hold the radiation shield plates 
firmly in place.
Preparing the Rain Collector
Refer to this section in your ISS Installation Manual.
Choosing a Site for the ISS
Refer to this section in your ISS Installation Manual. 
SIM Sensor 
Interface Ca
Cable Clamp
AC Power Adapter 
Cable 
(cabled models)
Solar Power 
Cable
(wireless models)
SIM Power
 Cable
(wireless mo
Temp/Hum
Sensor Cable
Junction Board Cable Connections
Junction Board Cover
Junction Board
Press in on Si
near latches 
to Remove Cove
Junction Board Cover Installation