Chamberlain Wireless Products Inc. CWPIR Manuale Utente

Pagina di 4
2
Step 5
Programming PIR Motion 
Sensor to Base Station
Test PIR Motion Sensor by waving hand in front of 
sensor. Test light should flash. Secure cover with the 
smallest screws.
Insert battery pack facing away from circuit board and 
attach cover. 
NOTE: Ensure the batteries do not touch the circuit 
board and the antenna and battery wires are not 
pinched.
Step 4
 Within 5 seconds, wave hand in front of PIR Motion 
Sensor. Test light will illuminate and Base Station 
will buzz.
A  Ensure Base 
Station and PIR 
Motion Sensor are 
in close proximity 
to each other. 
Press and release 
learn button on 
Base Station. 
Buzzer will sound.
Step 6
PIR Motion Sensor Installation
Mount PIR Motion Sensor 
horizontally on solid surface a few 
feet off the ground and within 900' 
of Base Station (rotate sensor to 
access screw holes). Unit should be able to swivel as 
needed. Attach sun/rain shield.
NOTE: Keep PIR Motion Sensor antenna away from 
metal objects. Do not mount PIR Motion Sensor in 
direct sunlight, near moving tree branches, or in the 
path of a sprinkler system.
Step 3
A
B
Learn Button