Automatic Power Inc 002000 Manuale Utente

Pagina di 17
Phalcon 2000 Installation Guide
Ref: HB-09300/01  Issue 1 
1
Chapter 1  Installation and Maintenance
1.1  Job Set Up Information
Table 1 Tools and Equipment
Part No / Type
Description
Remarks
N/A
Torque Wrench
50-60 Nm (37-44 lbf)
Fluke 75
Multimeter
Current consumption test
N/A
Laptop PC or palmtop
RS232 plus terminal
emulator
Table 2 Consumable Materials
Material No.
Description
Remarks
Sealant
Seal connectors
Grease
Bolt lubrication
WARNING: BE CAREFUL WHEN YOU USE THE CONSUMABLE MATERIALS. OBEY THE
MANUFACTURE'S HEALTH AND SAFETY INSTRUCTIONS.
1.2 Maintenance 
Requirements
Following proper installation and commissioning, little maintenance should be necessary.
To ensure trouble-free performance, it is recommended that Phalcon 2000 be inspected and
cleaned, as detailed in the Phalcon 2000 Handbook (Ref: HB-09300/01  Issue 1).
1.3 Test 
Equipment
For all diagnostics and most repair work on the Phalcon 2000, you will need a multimeter and a
serial terminal, e.g. laptop computer that has an RS 232 interface connection and terminal
emulation program.