Honeywell International Inc. 9PGTPL-100A Manuale Utente
Page 1017
1 Mar 2006
34-45-54
MAINTENANCE MANUAL
TPL-100A Processor / Part No. 940-0530-001
Use or disclosure of information on this page is subject to the restrictions in the proprietary notice of this document.
Table 1008. Directional Antenna Test Procedure
1.
PURPOSE
A. General
(1) This procedure has been written under the assumption the operator is familiar with the
basic operation of the Site Master S331. Chapter 2 of the user’s guide, Operation is an
excellent reference tool.
excellent reference tool.
(2) To provide a standard test procedure for directional TCAS II antenna systems
(including the coax cables, connectors and the directional antenna). This procedure
explains how to:
explains how to:
•
Use the ECS RF Troubleshooter kit to quickly evaluate the health of your antenna
system.
system.
•
Take Standing Wave Ratio (SWR) readings from the rack to the antenna.
•
Take SWR readings of a directional antenna, while the antenna is installed.
•
Take SWR readings of single and combination cable runs.
•
Distant to fault (DTF) measurements.
•
Define the typical SWR value for a given interface (i.e., BNC, TNC, "N") over the
test frequency band.
test frequency band.
2.
Equipment
A. General
(1) ECS RF Troubleshooter Kit, part number 11044-101.
3.
TCAS II SWR Test Set-Up
A. General
(1) Remove the Site Master S331 from the hard case. Open the cover of the soft case and
press the ON/OFF key. As the display turns on, verify the self test indicator displays
"Passed". Check the battery indicator and confirm the unit is sufficiently charged. The
battery charge symbol, is continuously displayed in the top-right corner of the display.
A totally black bar indicates a fully charged battery. If the charge is low, the AC to DC
power adapter can be connected and used during this test.
"Passed". Check the battery indicator and confirm the unit is sufficiently charged. The
battery charge symbol, is continuously displayed in the top-right corner of the display.
A totally black bar indicates a fully charged battery. If the charge is low, the AC to DC
power adapter can be connected and used during this test.
(2) Check Site Master’s Optional settings by pressing the OPT soft key from the main
menu. Verify the options are set according to table 1. The user has the option of
selecting either English or Metric measuring system, by pressing
selecting either English or Metric measuring system, by pressing
B5
soft key.