Furuno USA Inc 9ZWFM4850 Manuale Utente

Pagina di 133
FM-4850  Operator’s  Manual 
INSTALLATION 
 
89 
 
 
15.3.4 
Power Cable 
Step 1
 
Remove the outer sheath at one end of the cable on the unit. 
 
Step 2
 
Referring to the figure below, place heat shrink tubes on the wires, and 
then solder the connection point. 
 
Step 3
 
Move the heat shrink tubes to the soldered connection, and then apply 
heat to the tubes.