Invenco Group Ltd G6OPT Manuale Utente
DCV-00001 Rev 05 S2 G6 OPT Installation Guide
Page 19
5 First Power-Up
Once the installation is complete and the wiring is certified (if necessary), the main power may
be switched on.
The G6 OPT takes a couple of minutes to complete its start-up phase during which several
information screens will be presented (these vary depending on the customer).
When the terminal is trying to connect to the Ethernet LAN it will display the following screen:
be switched on.
The G6 OPT takes a couple of minutes to complete its start-up phase during which several
information screens will be presented (these vary depending on the customer).
When the terminal is trying to connect to the Ethernet LAN it will display the following screen:
If the Ethernet LAN is not operational the terminal will keep the above screen displayed.
If the terminal is successful in connecting to the Ethernet LAN it will display the following
screen and the rest of the normal start-up sequence will continue (this also varies depending
on the customer):
If the terminal is successful in connecting to the Ethernet LAN it will display the following
screen and the rest of the normal start-up sequence will continue (this also varies depending
on the customer):
Follow the steps in Section 6.2 to load a fresh roll of paper.