Recommended build-up of floor surface components:
It is always essential to follow the Instructions for Use provided by the manufacturer of the building materials
used (adhesive, levelling compound, insulating material). Do not lay any heating elements underneath baths
or shower bases - or in areas which will be directly covered by furniture or built-in units.
Base surface:
The  base  surface  must  be  solid,  undeformable,  clean,  free  from  cracks  and  any  materials  which  impede
adhesion.  It  must  also  be  able  to  carry  superimposed  loads.  If  a  new  screed  is  to  be  applied  (cement  or
anhydrite) the nature of its surface must be examined. If in poor condition the surface must be ground down,
vacuum  cleaned  and  then  primed.  In  this  event  pay  careful  attention  to  the  recommendations  of  the
suppliers of the materials used.
Recommended products:
By  way of providing typical examples,  we  offer  below  suggestions  for  the  use  of  products  supplied  by  the
manufacturers  PCI  Augsburg  GmbH,  Piccardstraße  11,  86159  Augsburg.  Naturally,  similar  products
supplied  by  other  manufacturers  (e.g.  Ardex,  Knauf,  etc)  are  equally  suitable.  However,  please  follow  the
instructions provided by the individual suppliers..

  Laying tiles and other ceramic floor products on a screed
Apply the adhesive (e.g. "PCI-FlexMortel")  onto the screed using a 6-mm-toothed spatula. Embed the
heating element into the mortar with the heating cable underneath.. Apply more adhesive using a 10-mm-
toothed spatula. Place the tiles or other ceramic floor material in position.

  Laying natural stone products on  the screed:
Proceed as described above but use, e.g. "PCI-Carraflex" as the adhesive.

  Laying soft materials such as carpets, PVC, parquet blocks, etc. on the screed:
Apply  the  adhesive  (e.g.  "PCI-FlexMortel")    onto  the  screed  using  a  6-mm-toothed  spatula.  Embed  the
heating  element  into  the  mortar  with  the  heating  cable  underneath.  When  this  has  hardened,  apply  a
universal filler mass such as PCI-USP32 in a layer which is at least 5 mm thick. When this has hardened,
the particular soft floor covering can be put in place using an adhesive (typically Textil-Belagskleber(Textile-
covering  material  adhesive)  PCI-TKL315,  PVC-Belagskleber  (Covering  material  adhesive)  PCI-PKL324,
Linoliumkleber  (Linolium  adhesive)  PCI-LKL334,  Korkkontaktkleber  (Cork  contact  adhesive)  PCI-KKL347,
Parkettkleber (Parquet Block adhesive) PCI-PAR354, etc.) -  i.e.  adhesives  specially  prepared  for  the  floor
covering being used.

  If it is necessary to level the floor because of surface irregularities:
we recommend the readily-flowing screed levelling material "PCI-Periplan" applied as a layer 4 - 5 mm
thick. This can be followed by the laying activity using PCI-Flexmortel as described above.

  For filling joins between tiles or other ceramic floor materials we recommend:
"PCI-Flexfuge". Finally, wall gaps and expansion joints can  be filled  with the elastic material "PCI-
Silcoferm-S"

  For filling joins between natural stones we  recommend:
"PCI-Carrafug" or "PCI-Carrafern"

  Preliminary treatment required when laying upon a solid wooden floor base:
Remove all dust and other forms of soiling, close the cracks in the floor with "PCI-Adaptol" and apply an
adhesive primer such as "PCI-Flächengrund-404". When this has dried out  apply a levelling compound
such as "PCI-Periplan". After this, too, has dried out the covering material may be applied as described
above. Under no circumstances may the heating elements be laid over movement joins.

  Preliminary treatment required when laying upon a chipboard base:
Remove all dust and other contamination, prime with "PCI-Wadian" and allow to dry. Then proceed to
lay the selected floor covering as described above. The chipboard slabs must be at least 25 mm thick
and must be secured to the sub-floor by screws spaced no more than 40 cm apart.
Under no circumstances may the heating elements be laid over movement joins.