Application Specification                   114-106078 
Jul 11
th
, 2013   Rev. C1 
This specification is a controlled document.                                      Page 3 of 12 
 
© Copyright 2012 by TE Connectivity Corporation 
All rights reserved 
 
TE internal test report: 501-106078 
TUV cert. reference document: EN 50521 
Requirements 
Do NOT disconnect under load! 
Current path should only be disconnected using approved disconnect devices. 
Symbol 
“Do not disconnect under load” is marked on the connectors 
 
Connectors should always be protected from silicon sealant (Oxime) during 
mounting, connectors should be assembled onto the Junction box which has 
been mounted on the panel modules for certain exposed time to cure silicon 
sealant (Oxime) properly. Recommended exposed time is 4 hours at least. 
 
Recommended panel lay method 
Mounting and installation must be done by qualified and trained staff considering 
all applying safety regulations. Failure to follow all instructions in Application 
Specification (available at www.te.com/documents), inc
luding using only 
approved TE tooling (if applicable), can result in improper installation and/or 
crimping which is dangerous and may cause or contribute to electrical fires. 
 
Do NOT use any oil or lubricants during mounting. 
 
PV4 connector can intermate with PV industry preference connector as last 
option but not preferred. 
 
3.1  General Instructions  
Any kind of pollution (dust, humidity, foreign particles etc.) during the assembly process can 
degrade contact and connectors performance. This applies in particular to the seals and the 
crimping of the contacts. A clean assembly environment is therefore essential.