Neuro Logic Systems 1U 17" & 19 LCD and Sun Keyboard Manuale Utente

Pagina di 13
RFT2 Rack Kit Installation Guide 
07/01/06 Rev 1.0 
 
Page 3 of 13
 
 
Hardware Installation 
 
Step Detail 
1. 
The following instructions assume that your 
equipment rack utilizes caged nuts. If you rack 
has pre-tapped holes there will be no need to 
include the caged nuts and the size of the 
mounting bolts may vary from that described. 
Determine the vertical location for the 
LCD/keyboard in the rack. Mark the location 
with tape or a pencil.  This product requires 
one rack unit (1 
”) of vertical space. Mount 
the LCD/keyboard at a convenient height for 
an average user. (Approx 44” from floor) 
 
2. Measure the distance from the front rack mounting 
rail to the rear rack mounting rail. (This distance will 
be needed during installation of the Rear slide 
mounting brackets in step 4) 
 
Distance= _____________ 
 
Ensure the bottom of the kit is properly positioned in a 
rack unit